Deadline DeskHargreave Property Management
Signed in as Property management and contracts
Sample dataProperty management and contracts
Contract file DOK-2024-0117
One document with everything attached to it: versions, approval trail, deadlines and history.
Elevator maintenance contract
in force — notice period runningDOK-2024-0117 · 42 Fairview Avenue, Rochester, NY 14607
Contract
- Counterparty
- PrimeLift Engineering LLC, Buffalo
- Type
- Maintenance contract with fault call-out
- Start
- 1 January 2024
- Term
- 3 years, ending 31 December 2026
- Renewal
- by 12 months unless terminated in time
Deadlines
- Notice period
- 3 months to the end of the term
- Termination on notice possible until
- 30 September 2026
- Follow-up
- 31 July 2026 — rule: 60 days before the deadline, moved to the preceding working day
- Retention
- 10 years after the contract ends — house rule, see Filing
Filing and access
- Filing location
- Properties / 42 Fairview Avenue / Contracts
- Version in force
- v4 of 12 March 2026
- Permissions
- Property management (read, edit), Accounts (read)
- Sign-off
- given on 14 March 2026 by S. Whitfield
Versions
| Version | Date | Change | Filed by | Status |
|---|---|---|---|---|
| Draft | Date28 Jul 2026 | ChangeDraft of a termination letter | Filed byM. Fenwick | Statusnot approved |
| v4 | Date12 Mar 2026 | ChangeAddendum on the maintenance fee, schedule 2 restated | Filed byM. Fenwick | Statusin force |
| v3 | Date4 Sep 2025 | ChangeFault call-out extended to Saturdays | Filed byS. Whitfield | Statussuperseded |
| v2 | Date17 Jan 2025 | ChangeContacts and phone numbers updated | Filed byK. Sinclair | Statussuperseded |
| v1 | Date19 Dec 2023 | ChangeFirst version, signed by both sides | Filed byR. Hargreave | Statussuperseded |
Older versions stay readable and are never overwritten. The version in force is v4.
Approval trail of the version in force
Uploaded
12 Mar 2026 · M. Fenwick
Technical review
13 Mar 2026 · Property management
Sign-off given
14 Mar 2026 · S. Whitfield
Set as the version in force
14 Mar 2026
Follow-up before the deadline
due today, 31 July
Decision on termination
by 30 September
History
Draft filed
28 Jul, 9:14 AMA draft termination letter was filed and flagged as a draft. A draft never becomes the version in force.
M. Fenwick
Comparison quote requested
14 Jul, 4:02 PMA quote was requested from a second maintenance firm so there is something to decide on at the follow-up on 31 July.
S. Whitfield
Sign-off given
14 Mar, 11:37 AMVersion 4 reviewed and set as the version in force; version 3 superseded.
S. Whitfield
Version 4 uploaded
12 Mar, 8:50 AMAddendum on the maintenance fee, returned signed by the counterparty.
M. Fenwick
Permissions extended
9 Jan, 10:20 AMAccounts granted read access to the contract file so invoices can be matched to the contract.
R. Hargreave
How Awelior would approach this project
Hargreave Property Management is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.
Where it starts
Hargreave Property Management looks after 38 properties with contracts, inspection records and notice periods. The contracts sit in binders and in a network folder called “Contracts_new_final”, the deadlines in a spreadsheet. What gets missed is rarely the contract but the date: an automatic renewal that goes through because nobody looked in time.
Decisions
The deadline is the center, not the document
A document system that only files replaces one binder with another. So the follow-up date is the load-bearing structure — the contract record hangs off it, not the other way round.
Every document belongs to a property
Every contract attaches to a property. Across 38 buildings that is the only order that survives a change of case handler; filing by contract type does not.
Permissions on a screen of their own
Who may see which file is a domain question in property management, not a background setting. So it stands as its own area next to the archive.
Deliberately left outNo text recognition and no automatic deadline extraction from contract wording. A misread notice period is more dangerous than none at all — it looks like a fact and is a guess.
What is in it
- Screens
- 5
- Content blocks
- 18
- Languages
- 4
Five screens, in all four languages, with sidebar, header and stated role. Navigation works; tables, filters, calendar, step chains, history and forms are rendered and inert. Properties, contracts and deadlines are invented.
How it would go on
Actually storing documents
Location, versions, permissions and backup — plus the route by which a scanned contract finds its way to the right property.
Reminders that arrive
A follow-up has to reach somebody out of the system: mailbox, task list, cover during leave.
Retention and deletion
Commercial and tax retention periods on one side, deletion duties on the other. The same archive has to serve both.
An application like this for your business?
Deadline Desk is invented — the way it is cut is not. Applications like this come out of the processes a business already runs.
Sample application by Awelior. Invented business, invented data, nothing stored.