Project FlowSinclair & Pryce Consulting Engineers

Sample data

P-2451 — New workshop hall, Elkhart

One project with its estimate, its work stages, its work packages and its history.

P-2451 — New workshop hall, Elkhart

In progress

Sandiford Steel Fabrications LLC · structural design and site supervision

Commission

Order number
A-2026-018
Commissioned
12 Feb 2026
Scope of service
Structural design stages 1–6, site supervision stage 8
Client contact
Mr. Sandiford, president

Estimate

Fee, net
$184,000.00
Hours estimated
1,480 h
Hours booked
1,154 h
Budget used
78 %
Average hourly rate
$124.00

Status and dates

Project lead
Miriam Pryce
Current work stage
Stage 5 — detailed design
Next milestone
Shell drawings handed over, 21 Aug
Variation orders
1 instructed, 1 under review

Work stages

  1. Stage 1 — appraisal

    completed 24 Feb

  2. Stage 2 — concept design

    completed 19 Mar

  3. Stage 3 — developed design

    completed 6 May

  4. Stage 4 — planning submission

    consent granted 2 Jul

  5. Stage 5 — detailed design

    under way · 74 % of package hours booked

  6. Stage 6 — tender preparation

    planned from 9 Sep

  7. Stage 8 — site supervision

    planned from 4 Nov

Work packages

Estimated against booked hours. A negative remainder means the package has run over.

Work packageResponsibleEstimatedBookedRemainingStatus
Structural analysis of the portal framesResponsibleMiriam PryceEstimated260 hBooked268 hRemaining−8 hStatusOver
Foundations and ground slabResponsibleThomas ClarkeEstimated180 hBooked142 hRemaining38 hStatusUnder way
Formwork and reinforcement drawingsResponsibleLucy SparrowEstimated420 hBooked311 hRemaining109 hStatusUnder way
Steel fabrication drawings (variation N-01)ResponsiblePaul JacobsEstimated160 hBooked74 hRemaining86 hStatusVariation instructed
Structural fire safety statementResponsibleRuth OsborneEstimated90 hBooked96 hRemaining−6 hStatusCompleted
Support for the checking engineerResponsibleMiriam PryceEstimated120 hBooked48 hRemaining72 hStatusOpen

Packages estimated 1,230 h · booked 939 h · plus 215 h of internal project hours, 250 h held in reserve

History

  1. Variation order N-02 submitted

    29 Jul, 4:20 PM

    Additional check of the crane runway, 40 h at $128.00. Waiting for written instruction.

    Miriam Pryce

  2. Interim invoice 3 sent

    24 Jul, 9:05 AM

    $42,000.00 against assessed progress on stage 4, due 7 Aug.

    Kate Mullins

  3. Estimate revised

    17 Jul, 11:40 AM

    Variation N-01 (steel fabrication drawings) added to the estimate with $20,000.00 in fees and 160 h.

    Edward Sinclair

  4. Planning consent granted

    2 Jul, 8:15 AM

    Stage 4 complete, the decision notice is filed in the project folder.

    Thomas Clarke

  5. Package hours reached

    18 Jun, 2:30 PM

    The work package “Structural analysis of the portal frames” has used 100 % of its estimated hours.

    automatic notice

The project frame

How Awelior would approach this project

Sinclair & Pryce Consulting Engineers is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.

Where it starts

Sinclair & Pryce Consulting Engineers work in defined work stages against agreed fees. Hours sit in one spreadsheet per engineer, budgets in a second, and the invoicing tool knows about neither. A project can therefore run over for months without anyone noticing — it gets noticed when the invoice goes out and the number does not fit.

Decisions

  • Hours and budget side by side, not one after the other

    On the project screen the consumption sits next to the allowance per work stage. That is the only presentation a decision can be taken from while the work is running — a month-end report is news, not steering.

  • Work stages as a step chain

    In an engineering practice a project is not a bar with a percentage on it, but a sequence of clearly named stages with handovers. The step chain shows exactly that and spares everyone the question of what “60 per cent done” is supposed to mean.

  • Time recording on a screen of its own

    It is the screen everyone uses daily — and the one a system like this dies on if it is awkward. So it sits as an equal in the sidebar rather than buried inside the project.

Deliberately left outNo cross-project resource planning and no utilization forecast. A forecast built on figures that are only just being captured properly would be a claim — it comes once the data has held up for a year.

What is in it

Screens
5
Content blocks
19
Languages
4

Five screens, in all four languages, with sidebar, header and stated role. Navigation works; tables, board, charts, step chains, history and forms are rendered and inert. Project numbers and amounts are invented.

How it would go on

  • Fee regulations

    Chargeable costs, fee bands and refurbishment surcharges have to sit inside the allowance, or the system calculates past the agreement.

  • Accounting and payments received

    Interim invoices, the final invoice and outstanding items belong together, so that project status also knows payment status.

  • Document storage

    Drawings, minutes, correspondence — with revisions, and the question of what is kept for how long after completion.

Talk through your project

Sample data

An application like this for your business?

Project Flow is invented — the way it is cut is not. Applications like this come out of the processes a business already runs.

Sample application by Awelior. Invented business, invented data, nothing stored.