Hallworth Site DiaryHallworth Construction, Fort Collins

What still has to go in

Twenty minutes before knocking off: enter the stoppage from 11:20 AM, confirm 62.75 hours, keep an eye on the deadline for M-07. Whatever is not in by 4:30 PM is in no report.

Hallworth Site Diary is a sample app by Awelior. Invented business, invented data, nothing is stored.

What still has to go in

Sample data

Rain since 11:20 AM — pour called off

The downtime is being recorded as it happens. Weather, times and the trades affected go into the report; the office writes the delay notice from it.

9On site7 own crew, 2 subcontractors
62.75Hours today2.25 of them downtime
3Open defectsone due 18 Aug
2Reports not signed off12 and 13 Aug

Site diary

Tapping a row opens the daily report with weather, hours and photos. Signed-off reports can no longer be changed — only added to.

About this app

Hallworth Construction does not exist. The project, crew, names, hours, defects and deadlines on these screens are invented and describe no real building site.

The demo stores nothing and sends nothing. Checkboxes, buttons and input fields are fully labeled but have no effect.

Today

Daily report no. 138

Sample data

Thursday, 14 August 2026

Project 2026-14 · Meadowbank Nursery, Fort Collins

In progress

Project

Number
BV 2026-14
Section
Section 2 — first floor shell
Client
Municipal building department, package 3 shell
Site manager
Karen Whitfield

Weather

Morning, 7:00 AM
Overcast, 14 °C, dry
Midday, 12:00 PM
Heavy rain, 16 °C
Afternoon, 4:00 PM
Showers, 15 °C, gusty

Downtime

From
11:20 AM
To
1:35 PM
Duration
2.25 hours
Affected
Ground floor slab pour, concrete gang

Work done

Morning
Rebar to ground floor slab completed, edge shuttering set
Afternoon
Column formwork grid D struck, site sheeted over
Plant
Tower crane, concrete pump canceled at 11:40 AM

Add weather and downtime

Three details nobody remembers precisely by the evening — which is why they are captured here and not back at the office.

Anything further back than three days is changed by the site manager only.

Conditions
Heavy rain

The conditions decide whether downtime turns into a formal delay notice.

Measured at the site hut, in °C.

The moment the pour was called off.

2.25 hours. Quarter hours, not rounded to whole ones.

What is written here ends up in the delay notice. Without times it is worthless.

This form submits nothing.

Photos for the day

Straight from the camera, stamped with time and section on the report — not sorted out of a phone into an email at night.

  • Rebar to ground floor slab, complete10:52 AM · synced
  • Standing water on the formwork11:26 AM · held offline
  • Rebar sheeted over1:48 PM · held offline
  • Delivery note, ready-mix concrete9:15 AM · synced

Schematic shapes instead of photos: the business is invented, so there are no real pictures of it. Your app would show images from your own site here.

Confirm the hours

Sample data
7Own crewone off sick
2Subcontractorsscaffolders, half a day
62.75Hours in total2.25 of them downtime
1Entry outstandingcrane driver, set-up time

Present on 14 Aug

What is recorded is time on site, not whereabouts. Where someone spends their break is none of the app's business.

  • Robert KavanaghRecordedForeman · 6:45 AM to 4:00 PM8.75
  • Terry WalcottRecordedBricklayer · 7:00 AM to 4:00 PM8.25
  • Ian KerriganRecordedSteel fixer · 7:00 AM to 4:00 PM8.25
  • Dean AshbyRecordedConcreter · 7:00 AM to 2:00 PM, then stood down6.25
  • Harry SinclairEntry outstandingCrane driver · 6:30 AM to 4:00 PM · set-up time missing8.75
  • Jack PearsonRecordedApprentice, 2nd year · college until 12:00 PM4.00
  • Simon BarkerAbsentBricklayer · off sick since 12 Aug0.00
  • Scaffolding gang, 2 peopleSubcontractedSubcontractor · 7:30 AM to 12:00 PM9.00

Add missing hours

The foreman enters them, the office approves them. An hour nobody can account for never reaches the payroll.

Person
Harry Sinclair

Pre-filled with whoever has something missing.

Type
Set-up time

Downtime is kept separate — it belongs in the delay notice, not in the measurement.

Raising the crane and the radio check.

0.75 hours.

Without a reason the office will not accept the entry.

This form submits nothing.

Log a defect

Sample data

Open and closed

Every defect carries a deadline. When one runs out it shows up here, not in a calendar nobody opens.

  • M-07 — Electrical opening missing, grid C/4Clock runningRaised 14 Aug, 8:40 AM · due 18 Aug4 days
  • M-06 — Insufficient cover to column S12Being put rightRaised by the site manager 13 Aug · due 20 Aug6 days
  • M-05 — No edge protection at the stair voidClearedRaised 12 Aug, 7:20 AM · cleared the same day0 days
  • M-04 — Release agent on rebar, grid BAcceptedRaised 8 Aug · cleaned, evidence on file—

M-07 — Electrical opening, grid C/4

The life of a defect from the moment it is spotted to acceptance. Every step carries a time, none of them a guess.

  1. Spotted on the walk-rounddone14 Aug, 8:40 AMThe 300 × 200 mm opening for the electrical riser is missing from the slab formwork. Drawing E-04, revision 22 Jul.
  2. Deadline setdone14 Aug, 9:05 AMTo be put right by 18 Aug, before the rebooked pour. After that the opening means core drilling.
  3. Subcontractor notifiedin progress14 Aug, 9:20 AMThe formwork gang is coming Monday at 7:00 AM. Confirmed by phone, in writing still outstanding.
  4. Photo once the work is donestill openstill openWithout a photo of the box-out in place the defect cannot be closed.
  5. Accepted by the site managerstill openstill openKaren Whitfield signs it off. Only then does the deadline drop out of the list.

Log the next defect

Filled in in the room it concerns. A defect without a deadline and without a name is a remark — and nobody puts remarks right.

Grid and element, not “round the back”. In four weeks somebody else has to find it.

Trade
Formwork

Decides who gets the notice — here the formwork gang.

Before the rescheduled pour on Monday at 7:00 AM. After that it means core drilling.

Photos
Two, with tape measure

Without a picture a defect is only a claim. Taken offline, uploaded later.

What is missing and against which drawing. The revision date saves the query.

This form submits nothing.

Get the report signed off

Sample data

No signal in the shell since 8:12 AM

Six entries are waiting: three photos, two time entries, one defect. Work carries on; everything goes out once there is signal at the site hut again.

Karen Whitfield, site manager

A thread attached to the job, not a number in a phone book: what is written here hangs on the report and can still be found in four weeks.

  1. Karen WhitfieldKaren WhitfieldI cannot sign off report 136 as it stands. The column formwork at grid C has no time for when the gang was stood down. The client checks that.13 Aug, 4:40 PM
  2. YouYou are right, that slipped through. Stood down at 2:30 PM, after that only clearing up with two people.13 Aug, 5:02 PMread
  3. Karen WhitfieldKaren WhitfieldThanks, 136 is signed off. On 137: I raised the cover to S12 yesterday — please log it as a defect, not just as a remark in the report.today, 7:55 AM
  4. YouLogged as M-06, due 20 Aug. The photo of the cover meter is attached.today, 8:05 AMread
  5. YouPour called off, heavy rain since 11:20 AM. Pump canceled. Please get the delay notice ready.today, 11:44 AMwaiting for signal
  6. YouThe new date for the pour would be Monday 7:00 AM if the weather holds.today, 11:46 AMnot sent

The four states

On a building site this is no detail: between the ground floor and the crane there is no signal, and the report still has to be written.

  • Loading

    Fetching reports

    On the first open of the morning the frame of the site diary is there before the data is. An empty screen with a spinner looks like a broken app.

  • Nothing there

    No report for today yet

    On a Monday morning that is normal, not a fault. The screen says so and offers the next step instead of staying blank.

  • Failed

    Report 137 sent back

    The site manager returned it unsigned. The report stays complete on the device and moves back into progress — it is not silently dropped.

  • No connection

    No signal in the shell

    Photos, hours and defects carry on being captured on the device. Syncing runs by itself once there is signal at the site hut again.

No effect in this demo — nothing is stored.

In the hands of
Site foreman on a building site
Shown on
Android — title on the left, three system buttons below
Replaces
Replaces the site diary in the folder in the site hut, the timesheets on the clipboard and the defect photos sorted out of a phone into an email at night. The report is finished on site at 4:30 PM instead of at home at 8:00 PM, and the delay notice for the rain rests on 11:20 AM — a time captured when it started, not a recollection two days later.

Everything in this demo is laid out and none of it acts: buttons only report that they have no effect in the demo, checkboxes are fixed, input fields lead nowhere. Nothing is stored, sent or fetched.

The project frame

How Awelior would approach this project

Hallworth Construction, Fort Collins is invented — the way it is built is not. None of this is work delivered for a client. It is the shape we would give such a project — with the same depth, but without a client who would have to answer for it.

Where it starts

Hallworth Construction keeps a site diary for every project. Weather, crew, hours, disruptions and defects accumulate across the day on site and get written into a folder in the hut in the evening — from memory. When the client recalculates a disruption four weeks later, money hangs on it, and the time of day in question is the one thing nobody wrote down.

Decisions

  • The report is written in quarter hours, not in the evening

    Weather, and the start and end of a stoppage, are captured as they happen and not rounded to whole hours. The office writes the formal notice of disruption out of exactly those entries; without a time it is worthless, and by the evening nobody knows it precisely.

  • Once released, a report cannot be changed

    A released daily report can only be added to. A site diary that can be smoothed over afterwards is not evidence in a dispute but a claim with a date on it — and then it will not carry the variation.

  • What is recorded is time on site, not whereabouts

    A site app could log position as a side effect. Where somebody spends their break is none of the report's business; the foreman enters the hours, with a reason, because the office will not accept an unexplained addition anyway.

Deliberately left outNo tracking, no attendance capture by site boundary, no automatic crew time. That would be the obvious next step, and on a union site it is something to settle with the steward first — here, not collecting it is a decision rather than an oversight.

What is in it

Screens
5
Tabs
4
Content blocks
16
Languages
4

Navigation responds, including the route from the diary into a single daily report and back. The forms for weather, stoppage and additional hours, and the defects flow, are fully rendered and inert; the four states have a view of their own.

How it would go on

  • The route back to the office

    Hours into payroll, additions into job costing, disruptions into the correspondence with the client. Without that route the app only replaces the folder.

  • Subcontractors and bought-in work

    Who enters the hours of another firm's crew, who confirms them, and what happens when two companies describe the same day differently.

  • Evidential value and retention

    How long a site diary is kept, who may inspect it, and whether the digital version carries the same weight as the folder — the business settles that before the folder goes.